Tag: manufacturing capacity
Applied Materials to Double Manufacturing Capacity Amid Chip Equipment Demand Surge
Applied Materials plans to double production capacity to meet growing demand for chipmaking equipment fueled by the AI boom.
Read MoreTSMC’s 2-Nanometer Chip Production Fully Booked Through 2028
TSMC’s cutting-edge 2nm chip production capacity is fully booked for the next two years, with earliest deliveries expected by mid-2027.
Read MoreChipmakers Acquire Idle LCD Panel Factories Amid Semiconductor Shortage
Facing chip shortages, semiconductor manufacturers are purchasing dormant LCD panel factories to leverage similar production infrastructures.
Read MoreRecent Posts
- Researchers Develop First Silicon Spintronic Chip for Probabilistic AI Computing
- Corsair Unveils HX1000i Shift Crystal with Transparent Design at Computex 2026
- AI in May 2026: Effective Yet Imperfect in Real-World Applications
- Microsoft Surface Laptop Ultra Features Unconventionally Large USB-C Port
- Wentai Launches AiBARZA Aldan-D1515, First Power Supply with Cybenetics Diamond Certification